Mostrar el registro sencillo del ítem
dc.contributor.author | Nieto Chaupis, Huber | |
dc.contributor.author | Del Carpio Salinas, Jorge | |
dc.coverage.temporal | 19 October 2016 through 21 October 2016 | |
dc.date.accessioned | 2019-08-25T19:02:12Z | |
dc.date.available | 2019-08-25T19:02:12Z | |
dc.date.issued | 2016-10 | |
dc.identifier.citation | Nieto Chaupis, H., & Del Carpio Salinas, J. (Octubre, 2016). Simulation of the model predictive control applied to a combined cycle plant. En IEEE ANDESCON, Perú. | en_PE |
dc.identifier.uri | http://repositorio.uch.edu.pe/handle/uch/366 | |
dc.identifier.uri | https://ieeexplore.ieee.org/document/7836243 | |
dc.identifier.uri | http://dx.doi.org/10.1109/ANDESCON.2016.7836243 | |
dc.description.abstract | We present the simulation of the application of the Model-based Predictive Control (MPC) of the drum level in a Combined Cycle Plant in order to minimize the time for reaching the highest capacity of plant, around 225 MW. In contrast to others control techniques, our simulation yields that the MPC has shown capabilities as to reach its expected power in about 40 minutes before than PID, time which normally takes the whole industrial process under this control. In the present study, we have tested up to three different reference functions in order to compare performance during the drum level control. According to the simulations, the MPC working together with these reference functions is seen to be promising in the sense of providing efficiency to the plant from the startup until the time when system is reaching 225 MW. We have also calculated a minor discrepancy of order of lees than 5%. | en |
dc.description.sponsorship | IEEE Peru Section | |
dc.language.iso | eng | |
dc.publisher | Institute of Electrical and Electronics Engineers Inc. | en_PE |
dc.relation | info:eu-repo/semantics/article | en_PE |
dc.relation.isPartOf | IEEE ANDESCON, ANDESCON 2016 | |
dc.rights | info:eu-repo/semantics/embargoedAccess | en_PE |
dc.source | Repositorio Institucional - UCH | en_PE |
dc.source | Universidad de Ciencias y Humanidades | en_PE |
dc.subject | Combined cycle power plants | en |
dc.subject | Plant startup | en |
dc.subject | Predictive control systems | en |
dc.subject | Combined cycle plant | en |
dc.subject | Control techniques | en |
dc.subject | Drum Level | en |
dc.subject | Expected power | en |
dc.subject | Industrial processs | en |
dc.subject | Model based predictive control | en |
dc.subject | Reference functions | en |
dc.subject | Model predictive control | en |
dc.title | Simulation of the model predictive control applied to a combined cycle plant | en_PE |
dc.type | info:eu-repo/semantics/conferenceObject | en_PE |
dc.identifier.doi | 10.1109/ANDESCON.2016.7836243 | en_PE |
dc.identifier.journal | IEEE ANDESCON | en_PE |
dc.identifier.scopus | 2-s2.0-85015225036 |
Ficheros | Tamaño | Formato | Ver |
---|---|---|---|
No hay ficheros asociados a este ítem. |